Kitchen — Polar White carcase, Notaio Walnut fronts
Your estimatorNadia Fischer
enquiries@marcrichards.com.au
(03) 9357 8998
Dear Sarah, Thank you for inviting Marc Richards to quote on your joinery. Below is our proposal room by room, built to your selections. Where we've shown options, pick the one you prefer; optional extras can be added at any time before production.
Kitchen
Polytec Woodmatt$29,328.20
Base cabinetry (per lineal metre) — Polytec Woodmatt
Island cabinetry — finished both sides — Polytec Woodmatt
2.4 lm
$4,972.80
Drawers in lieu of doors — Blum Legrabox soft-close
12 ea
$2,220.00
Finished end panel — Polytec Woodmatt
4 ea
$808.00
Undermount sink cut-out & polish
1 ea
$180.00
Cooktop cut-out
1 ea
$120.00
Concealed bin pull-out (2 × 35L)
1 ea
$395.00
Installation — Marc Richards install team
31 hr
$2,945.00
Handles — brushed brass 160mm
22 ea
$528.00
Benchtop — choose one
Optional extras
Site, delivery & general
$870.00
Design consultation, site measure & Microvellum shop drawings — included
1 item
Included
Delivery to site
1 ea
$220.00
Remove & dispose of existing joinery
1 item
$650.00
Subtotal (ex GST)$30,198.20
GST 10%$3,019.82
Total (inc GST)$33,218.02
Payment schedule
Deposit on acceptance (50%)$16,609.01
Balance on installation (50%)$16,609.01
EFT to Marc Richards Joinery Pty Ltd · BSB 063-142 · Acct 1088 5520 · ref Q-2026-1041
What's included
Free design consultation, site measure and Microvellum shop drawings for sign-off
18mm HMR carcases, edged in matching ABS, on adjustable legs with kickboards
Blum soft-close hinges and Legrabox drawer systems unless noted
AC Stone engineered silica-free benchtops where selected, templated after cabinet install
Delivery, installation and clean-up by the Marc Richards install team
Not included
Plumbing, electrical and gas connections (by others)
Appliances, sinks and tapware unless listed
Wall tiling, painting and making good
Removal of existing joinery unless listed
Prices are in Australian dollars and valid until 13 Sep 2026. Final dimensions are confirmed at site measure and on Microvellum shop drawings, which you sign off before production. Lead time is confirmed on acceptance.
Built for Marc Richards by Praxa Tech · Custom build, owned by Marc Richards on final payment.